Building Schools for the Future, Leeds

  • End User: Leeds LEA
  • Sector: Education
  • Project Type: New Build BSF Bid
  • Project Size: 100 sqm
  • Project Start: TBC
  • Project Completion: TBC
  • Project Value: £ undisclosed

QAD worked alongside other architectural practices and Kier Construction to develop the design of three secondary schools in a bid situation through to RIBA Stage 3. The schools were Allerton High, Allerton Grange and Rodillion High.

Key to the design process was the QAD collaborative approach where extensive emphasis was placed upon the consultation process to inform and develop the design brief to resemble something specific to each of the individual requirements of the respective schools.